
SUMMIT ENGINEERING GROUP LLC
12118 Fahrpark Lane
Saint Louis, MO 63146
ph: 314-325-4899
fax: 314-594-9922
alt: 314-456-6699
dsha
Educational:
New East High School , Ft Zumwalt School District (Multiple school building facility including 2 four story classroom buildings, Gym, Auditorium, library buildings etc)
SpecialServiceBuilding, Ft Zumwalt School District (2 story steel frame with reinforced concrete shearwalls, 35000 sqft)
NormandySchool Retrofit, St. Louis, MO (two 4-story Elevator towers addition to existing school building)
CityAcademy, St. Louis, MO (2-story masonry wall & steel framed system, 48,000 sqft)
SolomonSchecterDay School, Creve Coeur, MO (2 story steel framed system, 75,000 sqft)
EmgeElementary School addition, O’Fallon, MO (One story pre-eng metal framed building plus concrete on metal deck mezzanine, 22,000 sqft)
Addition and Renovation to AdamsSchool (3 story masonry wall & steel framed system, 87,000 sqft)
Addition to UM-St. Louis Fine arts building (2 story moment resisting steel framed, 55,000 sqft)
Addition to Mid-RiversHigh School (2 story steel framed system, 77,000 sqft)
Healthcare:
Addition and Renovation to Office/Packaging facility, KV- Pharmaceutical Corp., Earth City, MO (one-story plus mezzanine addition to existing tilt up wall structure, total construction cost 24 million dollars)
Costa Day hospital -addition to Cardinal Glennon Children’s hospital (2 story floor steel frame, composite floor system, 35,000 sqft.)
Surgical Medical Association of St. Charles (2 story wood structure with shear panels, TJI floor joists pre-eng wood roof trusses.)
OSF – St. JosephCardiacCareCenter, Bloomington, IL(3 story concrete frame and shearwall system with future 5-story steel floor addition)
SSM St. Charles Clinic, St. Charles, MO (2 story steel frame with X braces with future 2 bay additions)
Commercial:
Jinjiang City Post Office and Telecommunication Tower, Jinjiang City, Fujian Province, China (32 story reinforced concrete shearwall and frame structure, pile foundations, 320,000 sq. ft)
Office Depot, Alton Corners, IL (one story masonry shear wall & steel frame system, 20,000 sqft)
T.R. Hughes Retail and Office Building, St. Charles, MO (2 story moment resisting steel frame system, Wall footing and column footing foundation system, 88,000 sqft )
Fenton Industrial Park building A, Fenton, MO (two-story tilt-up concrete panel shear walls & steel frame system, 30,000 sqft)
Hedmark building II . St. Louis, MO (one-story tilt-up concrete panel shear wall and steel frame system with partial mezzanine level, 25,000 sqft.)
Dairy Queen, Twin Oaks, MO (single story masonry shear wall & steel frame system, 9,600 sqft)
Commerce Bank Addition, U-city, MO (single story steel frame system, 2,400 sqft)
LegendsCorporationRetailCenter, Fenton, MO (single story masonry shear wall & steel frame system, 75,000 sqft)
Session Fixture Corp. Building (single story tilt-up concrete panel shear wall & steel system, 60,000 sqft)
Religious:
Evangelical Children’s Home, St. Louis, MO (single story masonry wall and steel frame, 65,000 sqft.)
Addition and Renovation to Victory outreach Church, Olivette, MO (Pre-engineered metal building with wall and column footing foundation, saw cutting existing wall to form new sanctuary area.)
Sanctuary and EducationAddition-LutheranChurch of Webster Gardens, Webster, MO (steel frames with masonry shearwalls)
Govermental:
Addition to St. Charles JusticeCenter, St. Charles, MO (2 story concrete frame system, Concrete drilled pier foundation, 35,000 sqft.)
New Fire station #3 –Central county Fire/Rescue center, St. Peters, MO(2 story metal stud & masonry building)
West Overland Fire Protection District, Addition and Renovation (2 story metal stud/steel framed addition, 12,000 sqft)
FloraCity Hall (one story steel moment framed system w/ pre-eng wood roof trusses)
Copyright 2012 SUMMIT ENGINEERING GROUP LLC. All rights reserved.
SUMMIT ENGINEERING GROUP LLC
12118 Fahrpark Lane
Saint Louis, MO 63146
ph: 314-325-4899
fax: 314-594-9922
alt: 314-456-6699
dsha